Transforming your pool into a stunning backyard centerpiece is an exciting journey. Once you’ve planned your remodel and hired a contractor, the hands-on work begins with draining the pool. Below is a focused guide to the pool remodeling process, starting from that pivotal first step and following through to the final chemical balance.
While some Cities and States do it differently, these steps are specifically are the Pool Remodeling Steps in Arizona done by Swimming Pool Service and Repair in Maricopa County and greater Phoenix area.
1. Drain the Pool
The remodel begins by safely draining the pool. This involves using a submersible pump to remove all water, directing it to the sewer clean out or an appropriate drainage area per local regulations. This step can take a few hours to a day, depending on the pool’s size.
2. Pool Interior Chip Out
Next, the existing interior surface is chipped away to prepare for upgrades or repairs. This involves removing old plaster, tiles, or other finishes using specialized tools like pneumatic chipping hammers and angle grinders. The goal is to expose the underlying structure to assess for cracks, leaks, or other damage. This step is labor-intensive and can be noisy, often taking 1-2 day depending on the pool’s condition and size. Debris is cleared away the same day via truck, and the surface is cleaned to ensure a solid foundation for the next phases.
3. Pool Modifications
With the interior exposed, structural and functional modifications are made. This step addresses any repairs, such as fixing cracks in the pool shell or replacing outdated plumbing and electrical systems. It’s also when major upgrades are implemented, like reshaping the pool, modifying deck or coping, adding a spa, or installing new features such as waterfalls, tanning ledges (Baja Shelf, Beach Entry, Sun Shelf), dedicated suctions lines, automatic water levelers, new plumbing returns and suction lines, or energy-efficient equipment (e.g., variable-speed pumps or LED lighting). This phase varies widely in duration—anywhere from a few days to a couple of weeks—depending on the complexity of the changes.
4. Pool Tile
Once modifications are complete, new tiles are installed to enhance the pool’s aesthetic and durability. Tiles are typically applied along the waterline, steps, or as decorative accents. Contractors carefully select materials like ceramic, porcelain, or glass mosaic tiles to match your design vision and withstand pool chemicals. The installation process involves precise cutting, setting, and grouting, ensuring a seamless and long-lasting finish. This step typically takes 2-5 days, depending on the intricacy of the design and the pool’s size.
5. Interior Surface
The pool’s interior is then resurfaced to create a smooth, attractive, and durable finish. Popular options include:
Plaster: A cost-effective, smooth surface available in various colors.
Pebble or aggregate: Textured and durable for a natural, upscale look.
Quartz or glass bead finishes: For enhanced durability and a vibrant sheen.
The surface is applied by skilled technicians, ensuring even coverage and proper curing. This process can take 1-2 days in Arizona to ensure the finish adheres correctly and resists wear.
.
6. Pool System Start-Up and Chemical Balance
With the physical remodel complete, the pool is refilled with water from the homeowners spigot, which can take 1-2 days depending on size and water source. The contractor then starts up the pool’s systems, including pumps, filters, heaters, and any new automation or lighting features. They’ll test all equipment to ensure proper operation. Finally, the water chemistry is balanced by adjusting pH, alkalinity, and chlorine levels snd calcium to make the pool safe and inviting for swimming.